R Line

The R Line has been turned down to make sure that no water flows to the end. There was a culvert that needed to be replaced under Bensel Rd. Crews are at the site finishing up the project and we hope to have water restored by this evening.

This entry was posted in Hermiston Irrigation District. Bookmark the permalink.