5/3/2024 Update
The repairs have been made to the M~Line and we will be pouring concrete tomorrow morning.
The R~Bypass is running water to the end of the M~Line so that we can run the MA, ME, S and T-Lines that come off of the M~Line.
The A~C drop along Canal Rd has been shut off to stop water from going to the drain near the Project area.
The A~Line has been turned up so that we can flow more water into the upper end of the Maxwell and D~Line.